Completed Healthcare Projects

Florida Hospital Tampa Facade

Project Description: Stevens Construction updated 202,732 square feet of exterior vertical wall surface at the existing facade of the Florida Hospital Tampa facility. The renovation included replacement of the glass and glazing system to a new impact resistant curtain wall glass and glazing system, waterproofing existing wall surfaces, stucco, and addition of architectural metal cladding, architectural features, and lighting.
The entire project occurred while the hospital remained in operation.

Client: John Negley, Florida Hospital Tampa
Architect: HuntonBrady Architects
Paul Macheske, AIA (407) 839-0886
Completion: January 2014

Florida Hospital Apopka Lab Upgrades

Project Description: The Florida Hospital CT Renovation Project consisted of the interior renovation of 600 SF of existing Hospital space to create a new CT procedure room, patient restroom, family waiting area, and control room area. This project was constructed adjacent to occupied areas of the Hospital and Type 3 ICRA was required and in place for the duration of the project.

The Equipment was provided by Philips and with this installation of a new Ingenuity CT the Hospital now utilizes a CT Suite with two fully operational CT machines that share a control room. A new AHU, Existing Building Structural Modification, Upgraded CEP Electrical Gear, and the rerouting of smoke compartment walls were also part of this project.

Client: Joe Niemann, Florida Hospital Office of Design and Construction
Architect: HuntonBrady Architects
Greg Braithwaite (407) 839-0886
Completion: August 2013

Florida Hospital Carrollwood Orthopedic Unit

Project Description: The Florida Hospital Carrollwood Orthopedic unit included the interior demolition of the entire 5th floor and reconstruction of a new orthopedic unit. The 17,579 SF newly renovated space features 25 private patient rooms, nurse stations, rehabilitation and associated spaces.

Client: Carole Philipson, Florida Hospital Carrollwood
Architect: Burt Hill/Pollock Krieg Architects, Inc
Lyn Pollock (239) 482-4761
Completion: July 2013

St. Mark's Surgery Center OR Addition

Project Description: Stevens Construction added a 4th operating room to an existing surgery center in Fort Myers. This project occured while the surgery center remained in operation, classifying it as a Type C, Class 2 (High Risk) ICRA project.

Clients:

Dr. Michael Collins, MD (239) 936-4706

Dr. Rick Palmon, MD (239) 768-0006

Dr. Patrick Flaharty, MD (239) 415-7576

Architect: Burt Hill/Pollock Krieg Architects, Inc
Lyn Pollock (239) 482-4761
Completion: November 2013

Garramone Plastic Surgery Renovation

Project Description: Stevens Construction coverted a former bank building to a 9,100 square-foot, luxury plastic surgery office with spa and wellness areas. Located on US 41 in Fort Myers, the two-story facility features exam rooms, spa rooms, procedure room, retail area, offices and a central atrium with a skylight.

Client: Dr. Ralph Garramone
(239) 482-1900
Completion: May 2013

Florida Hospital Carrollwood Cath Lab Renovation

Project Description: Stevens Construction recently completed renovation of an existing cath lab at Florida Hospital Carrollwood in Tampa. The project included upgrading of the finishes, updating of MEP systems and a scrub sink addition. New electrical and data outlet, as well as bracing and power were also added for the new OR lights.

Client: Brent Degeorge, Florida Hospital Carrollwood
Architect: Burt Hill/Pollock Krieg Architects, Inc
Lyn Pollock (239) 482-4761
Completion: April 2013

Park Central

Project Description: Stevens Construction replaced the stucco, stone moldings and windows and painted the exterior.

Client: Dr. Daitch and Dr. Frey, Advanced Pain Management & Spine Specialists
(239)437-8000
Completion: January 2013

Florida Hospital Altamonte Springs Pain Management

Project Description: Located at 711 State Road 436 in Altamonte Springs, the 5000 SF project underwent extensive value engineering prior to construction starting. The project includes a total build-out of the ground floor, upper floor and fire sprinkler upgrade of the entire five-story building.

Client: Jason Newmyer, Florida Hospital Altamonte Spine Center
(407) 303-2614
Architect: Fred M. Humphrey & Associates, Inc.
Jeffrey Smith (407)261-3200
Completion: October 2012

Cape Health Surgery Center

Project Description: Stevens Construction converted a vacant, existing surgery center into a 5,124 SF surgical facility featuring one operating room, four pre-op beds, six phase one recovery beds and three phase two recovery beds. The project was licensed and inspected by AHCA.

Client: Kris Breyley
239-851-2099
Architect: Harvard Jolly
(239) 275-7774
Completion: November 2012

Florida Hospital Tampa Pepin Angio Suite

Project Description: Stevens Construction completed an interior renovation for the Pepin Heart Institute Building within the Florida Hospital Tampa campus. The project included a renovation of an existing cath lab into a neuroradiology biplane lab with a Siemans Artis zee Biplane system, an innovative imaging system that provides physicians detailed three-dimensional views during angiography and neuroradiology procedures.
Construction occured while the Heart Institute remained in operation and required class IV ICRA measures, the most strict of guidelines for infection control during construction.

Client: John Negley, Florida Hospital Tampa
(813) 615-7722
Architect: Burt Hill/Pollock Krieg Architects, Inc
Lyn Pollock (239) 482-4761
Completion: May 2012

Vascular Specialists of Central Florida

Project Description: Stevens Construction completed an interior renovation for an angiography lab at the Vascular Specialists of Central Florida in Orlando. The healthcare project included converting two procedure rooms into one imaging/procedure room, converting a vacant office into a nurse station and remodeling a waiting area into a recovery room.

Client: James Hollenback, Spectra Contracting, Inc.
(269) 382-6884
Architect: Daytect Design, Inc
Robert Day (407)-276-6302
Completion: May 2012

Heritage Institute Renovation

Project Description: The renovation at Heritage Institute is comprised of an interior build-out for the dental assisting and dental radiology programs at the Heritage Institute. The project features four opratories, labratory and training areas with state of the art panoramic X-ray and digital radiography equipment.

Client: Tari Vondrasek, Project Manager, Heritage Schools
(720) 855-6014
Architect: Christopher J. Lee Architects, Inc.
Christopher Lee (239) 482-4272
Completion: May 2012

Carrollwood Radiology Renovation

Project Description: Stevens Construction remodeled the existing radiology department of the Florida Hospital Tampa Carrollwood Radiology. Occuring in multiple phases, the 3,526 SF project was completed while the facility remained operational.

Client: Carol Phillipson
(813) 932-2222
Architect: Burt Hill Pollock Krieg Architects, Inc.
Lyn Pollock, (239)482-4761
Completion: February 2012

Florida Hospital Heartland Medical Center ED Renovation

Project Description: Stevens Construction completed a 18,651 SF emergency department renovation at the Sebring campus of Florida Hospital Heartland Medical Center. Located at 4200 Sun N' Lake Blvd., the multi-phased project involves the renovation of 32 exam rooms, including two trauma areas, isolation exam rooms and three nurse's stations. The project was licensed and inspected by AHCA.

Client: Dennis Meliti
(863)402-3150
Architect: HuntonBrady Architects
Chris Dunlop, (407) 839-0886
Completion: January 2012

Today's Dental

Project Description: Located at 1501 Viscaya Parkway in Cape Coral, Today's Dental features 17 treatment rooms, two reception areas, conference room, laboratory, staff lounge and administrative offices.

Client: Dr. Todd Sharp
(239) 573-2329
Architect: Jason P. Tramonte Architect, Inc.
Jason Tramonte (239) 549-0997
Completion: May 2011

Eye Specialists Cornea and Laser Center

Project Description: Eye Specialists Cornea and Laser Center included the addition of 4,600 square feet, to total a 10,580 square feet ambulatory surgery center at completion. The center includes two operating rooms, recovery rooms, step-down recovery rooms, consultation areas, a patient lounge area and administrative offices.
This is an AHCA licensed project.

Client: Bob Lehet, Administrator
Gorovoy MD Eye Specialists (239) 939-1444
Architect: Christopher J. Lee Architects, Inc.
Christopher Lee (239) 482-4272
Completion: November 2010

Glenview at Pelican Bay

Project Description: Construction was completed in two phases and entailed interior renovations of the 12-story Continuing Care Retirement Community, including the skilled nursing and rehabilitation center, located within Pelican Bay in Naples. The facility remained in operation during the renovation.

Client: Juan Esquivel, Building & Facilities Director
The Glenview at Pelican Bay (239) 591-0011
Architect: Caffey Architecture
Laura Caffey, (239) 649-7338
Completion: August 2010

King's Crown Assisted Living Facility Renovations

Project Description: This project consists of over 24,000 square feet of renovations and additions to the existing four story King's Crown ALF located at Shell Point Retirement Community in Fort Myers, Florida. Stevens Construction remodeled all of the common and resident recreation areas on all three floors. The ground floor was also renovated and expanded to accommodate additional resident recreation areas and support offices. This project was completed while the facility remained in operation.

Client: Scott Moore, Asst. Vice President of Operations (239) 454-2190
Architect: Christopher J. Lee, AIA (239) 482-4272
Christopher Lee Architects, Inc.
Completion: February 2009

Shell Point Midrise Entries Renovations

Project Description: This project consisted of the expansion and renovation of three midrise residence entries and is located on the island portion of the Shell Point Retirement Community in Fort Myers, Florida. The project included converting the existing entry decks into useable outdoor living space for residents by constructing modern sun shade trellises and other attractive hardscape elements. These added hardscape elements blend in with and are part of an overall revitalization of the grand court yard which the three midrise residence buildings share.

This project won the 2008 Summit Award for Best Renovation

Client: Scott Moore, Asst. Vice President of Operations (239) 454-2190
Architect: Christopher J. Lee, AIA (239) 482-4272
Christopher Lee Architects, Inc.
Completion: May 2008

Florida Hospital 36-Bed Expansion

Project Description: This project consisted of the addition of over 50,000 square feet of new construction in Sebring. The first floor is 25,000 square feet of shell space with an additional 25,000 square feet as 36 patient rooms and associated support spaces.

This project was licensed and inspected by AHCA.

Stevens Construction was awarded the BIA Summit Award for this project.

Clients:

John Negley, Associate VP, Florida Hospital Tampa

(813) 615-7722

Architect: Paul Macheske, AIA (407) 839-0886
HuntonBrady Architects
Completion: January 2006

Florida Hospital Medical Seascape Imaging South

Project Description: This project consisted of the complete interior and exterior renovation of an existing building located in Sebring. The newly renovated 11,000 square feet facility houses both an outpatient diagnostic center and medical offices.

Clients:

John Negley, Associate VP, Florida Hospital Tampa

(813) 615-7722

Architect: Lyndon Pollock, AIA (239) 482-4761
Burt Hill/Pollock Krieg Architects, Inc.
Completion: October 2005

Vascular Access and Intervention Center

Project Description: Stevens Construction retrofitted the facility to accommodate the addition of innovative, diagnostic healthcare technology from General Electric, Advanta, Welch Allyn and Stryker Medical. Located at 2450 Goodlette Frank Road, the Vascular Access and Intervention Center remained in operation during construction and serves as the offices of Dr. Rajasinghe and Dr. Chahwan.

Client: James Hollenback, Spectra Contracting, Inc.
(269) 382-6884
Architect: Sheeley Architects, Inc.
Peter Shawinsky, AIA, (239) 482-2121
Completion: June 2010

Florida Heart Associates PET Scan

Project Description: The Florida Heart Associates renovation entailed the remodel of the existing space which included an upgrade of the electrical and air condition systems and reconfiguration of the space to accomodate a new diagnostic PET Scan. Construction occurred while the facility remained in operation.

Architect: Burt Hill/Pollock Krieg Architects, Inc.
Lyn Pollock, AIA (239) 482-4761
Completion: June 2010

Orthopedic Specialist

Project Description: The Orthopedic Specialists renovation consisted of an interior demolition of approximately 17,000 square feet and reconstruction of radiology suite, exam rooms, and support facility located in Fort Myers, Florida.

Client: Dr. Ronald Gardner, MD (239) 334-7000
Architect: Dan R. McGahey, AIA, LEED AP, CSI, NCARB
(239) 275-0225
Gora McGahey Associates in Architecture, Inc.
Completion: February 2007

Florida Hospital Wauchula ER Renovation

Project Description: Construction of the FH Wauchula ER started in 2007 and was completed in three phases while the hospital remained in operation. Phase one included a pharmacy remodel, phase two involved demolition, restructuring of the emergency room and the addition of a nurse's station and storefront doors. Phase three was completion of the treatment rooms.

This project is licensed and inspected by AHCA.

Client: Dennis Meliti, Engineering Director
(863) 402-3150
Architect: Lyn Pollock, AIA (239) 482-4761
Burt Hill/Pollock Kreig
Completion: August 2008

Florida Eye Health

Project Description: Florida Eye Health consisted of a 2,000 square feet remodel of existing office space into an optical center. The project is located in downtown Punta Gorda, Florida. The facility includes four exam rooms, testing lab, dilating area, visual field testing room, and an optical retail area.

Stevens Construction also built the Lehigh Acres office for Florida Eye Health.

Client: Dr. Jonathan M. Frantz, MD, FACS
Tammy Moore (239) 985-6939
Architect: Roland V. Stout, NCARB (239) 250-1427
Completion: December 2006

Florida Heart Associates Cath Lab

Project Description: Stevens Construction renovated the cath lab to include a clean storage area, and four new recovery beds at the Florida Heart Associates located at 1550 Barkley Circle in Fort Myers.

Architect: Burt Hill/Pollock Krieg Architects, Inc.
Lyn Pollock, AIA (239) 482-4761
Completion: August 2009

Florida Hospital Cath Lab One Renovation, Sebring

Project Description: This project entails a renovation of the existing cath lab, including the installation of new CT equipment and associated upgrades to the interior finishes.

Client: Dennis Meliti
Florida Hospital (863) 402-3150
Architect: HuntonBrady Architects
Jennifer Melton (407) 839-0886
Completion: May 2010

Florida Hospital Cath Lab, Zephyrhills

Project Description: This 2,300 square-foot renovation project includes a remodel of the existing hospital space to accomodate a new cath lab, computer room, control room and office space.

Client: John Negley, Associate VP, Florida Hospital Tampa
(813) 615-7722
Architect: Burt Hill/Pollock Krieg Architects, Inc.
Lyn Pollock, AIA (239) 482-4761
Completion: December 2008

Florida Hospital Cath Lab Two Addition, Sebring

Project Description: This project entails a renovation of an existing hospital space to accommodate a new cath lab and associated equipment and support services.

Client: Dennis Meliti
Florida Hospital (863) 402-3150
Architect: Burt Hill/Pollock Krieg Architects, Inc.
Lyn Pollock, AIA (239) 482-4761
Completion: November 2008

Twelve Oaks Medical Offices

Project Description: Located at 6748 Gall Blvd., the project consisted of the interior demolition and reconstruction of a 10,200 square-foot medical office building. The facility houses the new office of the Florida Hospital Orthopedic and Spine Institute, equipped with exam rooms, two X-Ray rooms, casting room and administrative offices.

Client: John Negley, Associate VP, Florida Hospital Tampa
(813) 615-7722
Architect: Burt Hill/Pollock Krieg Architects, Inc.
Lyn Pollock, AIA (239) 482-4761
Completion: October 2009

Premier Surgery Center of Sarasota

Project Description: The Premier Surgery Center of Sarasota entailed a renovation of 20 rooms within the existing facility, located at 983 Beneva Road. Modifications included the reconstruction of restroom facilities to meet current ADA standards and numerous restorative enhancements. Stevens Construction also added two stage-two recovery rooms to the surgery center, which remained operational while construction occured.

Client: Kimberly B. Albert
Ambulatory Surgical Centers of America (781) 826-6610
Architect: Hardaway Associates
(781) 235-5339
Completion: February 2010

Barkley Surgery Center

Project Description: This project consisited of a renovation of 8,284 square feet of an existing 12,200 square feet ambulatory surgery center in Fort Myers, Florida. There were four phases of construction which allowed the facility to remain in operation during construction. The newly remodeled center includes an operating suite, three exam/treatment rooms, six pre-op beds, six recovery beds, as well as supporting office and administrative areas.

This project was licensed and inspected by AHCA.

Client: Kerri Jo Gantt (239) 938-7629
Architect: Jason Tramonte (239) 549-0997
Jason P. Tramonte Architect, Inc.
Completion: July 2007