Stevens Construction Header

Pre Construction

Surgery Centre of SW Florida

Project Description: Stevens Construction will be converting a vacant, existing surgery center into a 5,124 SF surgical facility featuring one operating room, four pre-op beds, six phase one recovery beds and three phase two recovery beds. Slated to begin construction in March, the project will be licensed and inspected by AHCA upon completion.

Florida Hospital Tampa Facade

Project Description: Stevens Construction will be updating 202,732 square feet of exterior vertical wall surface at the existing facade of the Florida Hospital Tampa facility. Renovation includes replacement of the glass and glazing system to a new impact resistant curtain wall glass and glazing system, waterproofing existing wall surfaces, stucco, and addition of architectural metal cladding, architectural features, and lighting

Florida Hospital Carrollwood Orthopedic Unit

Project Description: The Florida Hospital Carrollwood Orthopedic unit includes the interior demolition of the entire 5th floor and reconstruction of a new orthopedic unit. The 17,579 SF newly renovated space will consist of 25 private patient rooms, nurse stations, rehabilitation and associated spaces.

Florida Hospital Altamonte Springs Pain Management

Project Description: Located at 711 State Road 436 in Altamonte Springs, the 5000 SF project has undergone extensive value engineering and is scheduled to begin in May. The project includes a total build-out of the ground floor, upper floor and fire sprinkler upgrade of the entire five-story building.

Garramone Medical Office

Project Description: Stevens Construction is converting a former bank building to a 9,100 SF luxury medical office with spa and wellness areas. Located on US 41 in Fort Myers, the two-story facility will have four exam rooms, seven spa rooms, procedure room, administrative offices and a central atrium with a skylight.

Abiding Love Evangelical Lutheran Church

Project Description: Stevens Construction will be building a 12,000 SF, single-stroy facility which will include nine classrooms, multi-purpose room with a stage and seating for 350 people, kitchen, offices and lobby. The project is located at 3205 Chiquita Blvd. in Cape Coral.